Al Zima - Al Jamom Road & Makkah - Al Taef (Al Seil) Road

Makkah, KSA

Project Description

Design Review and Construction Supervision Scope:

  • Nineteenth Group
    – Completion of selected roads in Makkah Al Mokaramah with a project value of 85,000,000 SAR.
    – Key works include the Briman Crossroad and the installation of lighting on the Makkah Al Mokaramah/Jeddah old road over a length of 13 km.
  • Twenty-First Group
    – Completion of roads in Makkah Al Mokaramah with a project value of 93,500,000 SAR.
    – Major works include the dualization of the Al Jamom/Al Zima road over a length of 10.5 km, including the construction of a valley bridge.
  • Twenty-Fourth Group
    – Completion of selected roads in Makkah Al Mokaramah with a project value of 60,986,860 SAR.
    – Scope includes the construction of the Al Baida/Edam road (12.4 km) and the completion of Aqabat Al Safiha (6.4 km).
  • Twenty-Fifth Group
    – Completion of roadworks in Makkah Al Mokaramah with a project value of 112,422,393 SAR.
    – Key projects include:
    Atana/Al Fahoul road (13.2 km).
    Bani Yazeid/Al Rayaheen road (5 km).
    Kassab/Al Fahoul joint (4.5 km).
    Twenty-Sixth Group
  • Completion of supplementary works on the dualization of the Al Taef/Al Baha/Abha road with a project value of 89,836,857 SAR.
    Twenty-Seventh Group
  • Completion of selected road projects in Makkah Al Mokaramah with a value of 57,000,000 SAR.
    Includes the joint for Ekaz Market and the Harad/Al Matarafa/Al Qafif road with a valley bridge.
    Twenty-Ninth Group
  • Completion of road projects in Makkah Al Mokaramah with a value of 92,334,770 SAR.
    Works include the dualization of the Al Jamom/Al Zima road (7.4 km) and the construction of two crossroad intersections.
    This extensive project portfolio underscores a commitment to enhancing regional connectivity, safety, and infrastructure in Makkah Al Mokaramah.

Client

Scope of Work

The project scope includes the following enhanced services for comprehensive design and construction supervision:

Design Review of Roads and Structural Works:
Thorough evaluation and review of all road designs and structural works to ensure they meet safety standards, regulatory requirements, and project specifications. This includes addressing design challenges and proposing improvements for optimized functionality and durability.

Construction Supervision:

  • Traffic Management during Construction: Effective management of traffic flow and safety during the construction phase, ensuring minimal disruption and safeguarding public and worker safety.
  • Quality Control: Rigorous inspection, testing, and evaluation processes to ensure that all materials and work performed meet the highest quality standards and regulatory requirements.
  • Time and Progress Control: Continuous monitoring of project timelines, tracking milestones, and implementing corrective measures to address delays, ensuring the project stays on schedule.
  • Contract Administration: Management of all contract-related activities, including the timely processing of variation orders, resolving disputes, and overseeing claims management to maintain project integrity and minimize risks.
  • Contractor’s Submittals Review and Approval: Detailed review of contractor submittals such as materials, shop drawings, and method statements, ensuring full compliance with project specifications and regulatory standards.
  • Risk Management and Control: Proactive identification, assessment, and management of risks throughout the construction process, ensuring that potential issues are addressed promptly and effectively.
  • Payment Certificates Review and Approval: Careful verification of payment certificates, ensuring they reflect work completed to date and comply with contractual terms before approvals are made.
  • Project Documentation and Reporting: Comprehensive maintenance of all project documentation, including progress reports, meeting minutes, and change logs, ensuring clear communication and proper record-keeping for all stakeholders.
  • Review of As-Built Drawings and Final Payment Certificate: Final review of as-built drawings to confirm accurate representation of completed works, and validation of the final payment certificate to ensure that all contractual obligations are fulfilled before project closure.

These enhanced services ensure efficient project execution, adherence to timelines, budget control, and compliance with quality and safety standards, contributing to the successful and seamless completion of the project.

Project Highlights



Project Duration: 

40 Months

ï•—

Nineteenth Group
Project Value: 85,000,000 SAR
Key Works:
Briman Crossroad
Lighting Installation on the Makkah Al Mokaramah/Jeddah old road (13 km)



Twenty-First Group
Project Value: 93,500,000 SAR
Key Works:
Dualization of Al Jamom/Al Zima Road (10.5 km)
Construction of Valley Bridge

k

Twenty-Fourth Group
Project Value: 60,986,860 SAR
Key Works:
Al Baida/Edam Road (12.4 km)
Aqabat Al Safiha (6.4 km)



Twenty-Fifth Group
Project Value: 112,422,393 SAR
Key Projects:
Atana/Al Fahoul Road (13.2 km)
Bani Yazeid/Al Rayaheen Road (5 km)
Kassab/Al Fahoul Joint (4.5 km)



Twenty-Sixth Group
Project Value: 89,836,857 SAR
Works:
Supplementary works on dualization of Al Taef/Al Baha/Abha Road

ï‹›

Twenty-Seventh Group
Project Value: 57,000,000 SAR
Key Works:
Joint for Ekaz Market
Harad/Al Matarafa/Al Qafif Road with valley bridge

h

Twenty-Ninth Group
Project Value: 92,334,770 SAR
Key Works:
Dualization of Al Jamom/Al Zima Road (7.4 km)
Construction of Two Crossroad Intersections

Related Projects

Rehabilitation Improvement and Maintenance of 425km Rural Roads in Western, Southern, and Sabaragamuwa Provinces
Eastern Province Supervision of Roads Agreement
Maintenance of Electrical Works for the Roads
Makkah Al Mokaramah - Jeddah Direct Road (4th Phase)