Al-Hijrah, Omar Ibn El Khattab and Yanbu Highway Interchanges -Third Ring Road

Al Madinah Al Mounawarah, KSA
  • Home
  • 9
  • Projects
  • 9
  • Al-Hijrah, Omar Ibn El Khattab and Yanbu Highway Interchanges -Third Ring Road

Project Description

The project entails the redesign of roads and bridges at the intersections of Al-Hijrah, Omar Ibn El Khattab and Yanbu Highway as part of the effort to complete the third ring road in Madinah. The redesign aims to avoid interference with the existing desalination water line, which requires reconsidering the shape, layout, and general arrangement of the intersections and bridges. This involves reassessing the current alignment to optimize traffic flow while ensuring the avoidance of the desalination pipeline. Detailed designs will be prepared for the new intersection and bridge configurations, adhering to local specifications and regulations. The project also includes close coordination with relevant utilities to manage the relocation or protection of the desalination line, ensuring minimal disruption to vital infrastructure. Ultimately, the redesigned intersections and bridges will improve traffic efficiency and safety, contributing to the successful completion of the third ring road.

Client

Scope of Work

  • Field Investigations Including Traffic
  • Assessment and Topographic Survey.
  • Hydrological and Geotechnical Studies.
  • Complete Highway Geometric and
  • Pavement Design.
  • Structural Analysis.
  • Complete Design of Crossing Bridges.
  • Quantities Survey and Cost Estimate.

Project Highlights



Project Duration: 

3



3 Cloverleaf interchanges

Related Projects

Feasibility Study for Sewage Treatment Plant for Dar Al-Jewar Residential Community Area and KEC North Area
Surface Water Level Reduction and Stormwater Drainage
Technical Support to the General Department of Design, MOT
Surface Water Levels Reduction and Water Drainage
Existing Air Traffic Control Tower - Gap Analysis