QBGG Interchange

Eastern Province, KSA

Project Description

Study And Design Of A Bridge Crossing The Pipelines Of QBGG Company And Interchange Between King Faisal Road And The Extension Of Jubail / Dhahran Road And Interchange Between Haradh / Batha Road And Shaybah / Batha / Jubail Road.

Client

Scope of Work

• Field investigations including Traffic
• Assessment and Topographic Survey;
• Hydrological and Geotechnical Studies;
• Complete Highway geometric and pavement design;
• Structural analysis and
• Complete design of crossing bridges;
• Quantities survey and Cost Estimate. And project includes flood mitigation and protection works along the road.

Project Highlights



Project Duration: 

36 Months

ï•—

1 Cloverleaf Interchange

ï‹›

1 Uturn Bridge

Related Projects

Feasibility Study for Sewage Treatment Plant for Dar Al-Jewar Residential Community Area and KEC North Area
Surface Water Level Reduction and Stormwater Drainage
Technical Support to the General Department of Design, MOT
Surface Water Levels Reduction and Water Drainage
Existing Air Traffic Control Tower - Gap Analysis