Design of the Marine Applied Research Center

KSA

Project Description

The Marine Applied Research Center is envisioned as a pivotal hub for advancing knowledge, promoting environmental awareness, and cultivating a culture of coastal resource conservation. The center will spearhead long-term awareness initiatives designed to actively engage stakeholders and beneficiary entities, emphasizing the preservation and sustainable management of natural coastal resources.
The center will feature essential facilities, including labs, a clinic, a conference area, and potentially an aquarium, providing a dynamic environment for research and innovation. The existing design for the Research Center from KFUPM will undergo a comprehensive review to align it with the needs of all stakeholders. The design includes a main building with a Built-Up Area (BUA) of 11,980 sqm, which will house various research facilities, offices, and other essential spaces. Additionally, a utility block with a BUA of 1,335 sqm will support the operations of the center. The external works cover 35,785 sqm and will include landscaping, roads, pathways, and parking areas. The review process will ensure that the design accommodates the requirements. A key focus of the project is sustainability, with the center designed to meet LEED standards.
By building a robust and comprehensive knowledge base on ecosystems along Saudi Arabia’s Gulf coast, the center will support their sustainable utilization and contribute to informed decision-making for their protection. Additionally, it will serve as a platform for raising public and institutional awareness about the importance of coastal and marine environments, fostering a deeper understanding of their ecological, economic, and cultural significance. Through its efforts, the center aims to ensure the enduring vitality of these critical ecosystems for future generations.

Client

Scope of Work

Design and study including: 

  • Reference Feasibility Study – Initial Meeting and Workshop
  • Reference Feasibility Study – Field Visit to Facilities
  • Reference Feasibility Study – Complete Study
  • Development of a Common Basis for Design and Project Design Report
  • Design Development at 30% Completion
  • Design Development at 60% Completion
  • Design Development at 90% Completion
  • Final Design.

Project Highlights



Project Duration: 

15 Months

ï•—

Main Building BUA 11,980m2

ï‹›

Utility Block BUA 1,335m2



External Works (Landscape, roads, parking and pathways) 35,785 m2

Related Projects

Feasibility Study for Sewage Treatment Plant for Dar Al-Jewar Residential Community Area and KEC North Area
Surface Water Level Reduction and Stormwater Drainage
Technical Support to the General Department of Design, MOT
Surface Water Levels Reduction and Water Drainage
Existing Air Traffic Control Tower - Gap Analysis